
Add to Cart
Photovoltaic Wire String Extrusion One-Step Extrusion Production Line 200m/min
warranty time: transportation expenses of replacement of spare parts, transportation expenses ,food expenses and accommodation expenses of the engineer arriving at the buyer's company shall be bear by the buyer
The buyer shall bear the cost of the round-trip air ticket for the first installation, and the transportation, accommodation and food expenses of the engineer arrives the customer’s country shall be bear by the buyer.
All the equipment and machinery, material for installation and labor, translator charge should be on Buyer’s account.
On site commissioning times. If we can't fly, we need remote debugging via video conference.
Estimated installation days: 7-10 days.
EV cables (electric vehicle high-voltage cables) are the core "blood vessels" of electric vehicle energy transmission, responsible for safely and efficiently transmitting high-current electrical energy between high-voltage batteries, drive motors, power electronic equipment (such as inverters, DC-DC converters) and charging interfaces. Their design is fundamentally different from ordinary automotive low-voltage cables and must meet stringent electrical, mechanical and environmental requirements.
Applications
Suitable for extrusion of insulation/sheath of PVC, TPE, TPU, XLPO, etc.;
Main process parameters
Extrusion materials: PVC, TPE, TPU, XLPE;
Main machine specifications: φ80mm, φ90mm, φ120mm;
Applicable conductor core wire diameter: φ1.5mm-φ20mm;
Finished outer diameter: φ2.5mm-φ25mm;
Maximum line speed: Max 110m/min;
Adaptation parameters of each model:
Screw specification (mm) | φ80 | φ90 | φ120 |
Maximum screw speed (rpm) | 90 | 90 | 80 |
PVC glue output (kg/h) | 280 | 360 | 500 |
XLPE glue output (kg/h) | 150 | 180 | 250 |
Aspect ratio (L/D) | 25/26:1 | ||
Drive power (kWAC) | 75 | 90 | 160 |
Barrel temperature control area | 5 | 5 | 6 |